EDF: Boron reconditioning and overflow systems

Cegelec CEM’s services cover the supply of two structures:

  • Boron reconditioning system, installed outside the controlled area
  • Boron overflow system in the boric acid preparation tanks, installed in the controlled area

Cegelec CEM is responsible for:

  • Site expert assessments
  • Design, sizing and installation studies
  • Procurement and manufacture of systems
  • Adjustment and factory testing
  • Dismantling of existing stations
  • Installation and commissioning
  • Operator training in the operation and maintenance of the systems