EDF: Boron reconditioning and overflow systems

Ensuring regulatory compliance

Ensuring that the boron reconditioning and overflow station complies with carcinogenic, mutagenic and reprotoxic regulations

Cegelec CEM’s services cover the supply of two structures:

  • Boron reconditioning system, installed outside the controlled area
  • Boron overflow system in the boric acid preparation tanks, installed in the controlled area

Cegelec CEM is responsible for:

  • Site expert assessments
  • Design, sizing and installation studies
  • Procurement and manufacture of systems
  • Adjustment and factory testing
  • Dismantling of existing stations
  • Installation and commissioning
  • Operator training in the operation and maintenance of the systems
Voir toutes nos références